Issue |
Hydroécol. Appl.
Volume 25, 2025
|
|
---|---|---|
Article Number | 1 | |
Number of page(s) | 41 | |
DOI | https://doi.org/10.1051/hydro/2025001 | |
Published online | 02 April 2025 |
Approche combinant analyse de risques environnementaux, suivis écologiques et concertation afin de réduire des impacts d’éclusées sur une population de truite commune
Nested approach combining environmental risk analysis, ecological monitoring and consultation to reduce the impacts of hydropeaking
1
ECOGEA, 352 avenue Roger Tissandier, 31600 Muret, France
2
Fédération de L’Ariège de Pêche et de Protection du Milieu Aquatique, Parc Technologique Delta Sud LDT Escoubetou, 09340 Verniolle, France
3
EDF-CIH Service Environnement et Société, EDF – Centre d’Ingénierie Hydraulique, Service travaux, 4 rue Claude Marie Perroud, 31096 Toulouse, France
4
EDF-CIH Service Environnement et Société, 4 avenue du Lac de Tignes, 73290 La Motte Servolex, France
* e-mail: philippe.baran@ecogea.fr
Les modifications des régimes hydrologiques induisent des changements dans le fonctionnement des milieux aquatiques notamment en aval des aménagements hydroélectriques. Afin de réduire les impacts écologiques liés à ces modifications, des diagnostics environnementaux et des études de dimensionnement de mesures de réductions doivent être mis en œuvre. C’est dans ce cadre qu’une approche novatrice a été développée afin d’accompagner un arrêt pour travaux d’un aménagement hydroélectrique de septembre 2018 à mars 2020 soumettant un tronçon court-circuité de 14,8 km de la rivière Vicdessos (Pyrénées) à un régime d’éclusées. En appui à la procédure réglementaire encadrant les travaux, le gestionnaire de l’aménagement (EDF) a souhaité conduire une démarche de concertation et de co-construction avec les acteurs locaux de la gestion des milieux aquatiques. Une approche basée sur des analyses de sensibilité environnementale, de risques écomorphologiques et d’études hydrauliques a permis la mise en œuvre de mesures d’atténuation des impacts des éclusées sur le cycle biologique de truite commune (Salmo trutta L.) : un arrêt ciblé des éclusées durant 3 semaines en période de reproduction, une limitation du débit maximal des éclusées en période de vie sous gravier, la mise en œuvre de gradients adoucis lors hausses des débits, ainsi qu’une réduction de leur nombre, voire un arrêt des éclusées durant 36 jours en période d’émergence des alevins. Afin de fixer le calendrier des mesures d’atténuation, des suivis de l’activité de reproduction et du régime thermique ont été mis en œuvre. Les résultats des inventaires piscicoles réalisés sur 2 stations du tronçon court-circuité avant et pendant les travaux ont été interprétés en fonction de l’intensité des crues hivernales et printanières. Les mesures d’atténuation ont permis de conserver une forte activité de reproduction des truites (respectivement 51,5 et 37,5 nids/100 m pendant et avant les travaux) et 68 % du niveau optimal de densités d’alevins. Cette réussite environnementale est avant tout une réussite collective basée sur une dynamique de concertation, l’expertise des acteurs locaux, une analyse des enjeux et des risques environnementaux ainsi qu’un monitoring biologique.
Abstract
Modifications of flow regimes lead to changes in the functioning of aquatic ecosystems, particularly downstream of hydroelectric powerplant. In order to reduce the ecological impacts linked to these modifications, environmental diagnostics must be implemented. It is within this framework that an innovative approach has been developed in order to follow the shutdown of a hydroelectric scheme for works from September 2018 to March 2020 subjected a by-pass section of 14.8 km of the Vicdessos river (Pyrenees) to an hydropeaking flow regime. In support of the regulatory procedure governing the work, the manager of the hydropower plant (EDF) wished to conduct a consultation and co-construction process with local stakeholders in the management of aquatic environments. An approach based on analyses of environmental sensitivity, ecomorphological risks and hydraulic studies enabled the implementation of measures to mitigate the impacts of the hydropeaking on the life cycle of the brown trout (Salmo trutta L.). A shutdown during 3 weeks of the spawning period, a limitation of the maximum flow rate of hydropeaks, a reduction of the number of hydropeaks during the emergence period and the implementation of flow rate increases allowed the conservation of the spawning activity and good hydraulic conditions during the emergence. Monitoring of spawning activity and thermal regime allowed the timing of mitigation measures to be determined. The results of fish sampling carried out at two stations in the by-pass section before and during the works were related to the intensity of winter and spring high flow. The mitigation measures made it possible to maintain high trout spawning activity during the works (51 and 37.5 redds/100 m respectively during and before the works) and 68% of the optimal level of fry densities. This environmental success is above all a collective success based on a dynamic of consultation, the expertise of local stakeholders, an analysis of environmental issues and risks, and biological monitoring.
Mots clés : analyse de risques / concertation / éclusée / hydroélectricité / mesure de réduction / tronçon court-circuité / truite
Key words: risk analysis / consultation / hydropeaking / hydroelectricity / mitigation measures / by-pass section / trout
© EDF, hosted by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.