Numéro |
Hydroécol. Appl.
Volume 9, 1997
|
|
---|---|---|
Page(s) | 241 - 262 | |
DOI | https://doi.org/10.1051/hydro:1997010 | |
Publié en ligne | 1 mai 2007 |
Les études ichtyologiques liées à la construction du barrage de Petit-Saut : un premier bilan et des recommandations
lchthyological studies relating to the construction of Petit-Saut dam: preliminary assessment and recommendations
1
Laboratoire d'Hydrobiologie, Centre ORSTOM de Cayenne, BP 165, Cayenne cedex, France
2
ORSTOM, BP 1434, Bouake, République de Côte d'Ivoire
La construction de barrages hydroélectriques s'accompagne le plus souvent d'études environnementales visant à évaluer et tenter de minimiser les conséquences sur l'environnement de ce type d'ouvrage. Idéalement ces études devraient intervenir tout au long du processus, depuis la phase de faisabilité jusqu'à une éventuelle stabi- lisation écologique des milieux. A Petit-Saut, les premières études ichtyologiques, menées avant le début de la construction, se sont d'emblée focalisées sur le site. Elles n'étaient donc pas concernées par le choix du site. Les études avant mise en eau ont permis une bonne connaissance de la systématique de I'ichtyofaune et de sa répartition spatiale dans le bassin. Elles ont apporté également quelques connaissances parcellaires de la biologie des principales espèces, et surtout permis l'initiation de deux approches nouvelles dans ce type de travail : l'écologie des juvéniles et l'étude des stratégies vitales des populations. Après mise en eau ces deux approches ont été approfondies pour suivre et tenter d'interpréter les modifications induites par le barrage. Au total, le bilan des études ichtyologiques sur le Sinnamary barré s'avère très positif. Cependant certains aspects des études environnementales pourraient être améliorés et nous formulons quelques recommandations.
Abstract
Large hydroelectric projects generally include environmental studies whose purpose is to understand and try to minimize the negative impacts of river damming on the environment. Ideally, these studies should be conducted throughout the entire process of dam construction, from the feasability studies until the possible ecological stabilization of the ecosystems created. At Petit-Saut, the first ichthyological studies, conducted before the beginning of construction, did not contribute to decision making concerning site choice. Studies prior to the filling of the reservoir produced comprehensive data on the knowledge of the systematics and the spatial distribution of the ichtyofauna. They also produced preliminary data on the biology of the main species and, more importantly, enabled the development of two original approaches to this kind of problem: ecology of juveniles and study of life-history strategies of populations. After closure of the dam, these two approaches were broadened so as to contribute to monitoring and the interpretation of changes in fish assemblages. On the whole, the overall contribution of the ichthyological studies on the damed Sinnamary river is extremely valuable. However, some aspects of the environmental studies could be improved and certain recommendations are formulated regarding this aspect.
Mots clés : Amérique du Sud / Guyane / barrage / écologie / poissons
Key words: South America / French Guiana / dam / ecology / fish
© EDF, 1997
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.